PLC Panel For Hydro Power Plant With Scada
We design & supply PLC Panel For Hydro Power Plant With SCADA
£1,044.33 Inc Tax
Product Details:
Minimum Order Quantity | 1 Piece(s) |
Brand | R S Enter |
Dimension | 1500 x 1000 x 300 mm |
Current | 20 Amps |
Automation Grade | Automatic |
Frequency | 50 Hz |
System Architecture:
- Control Room
- LT Panel Room
- 33 KV Switch Yard
- 2 nos. Frances Turbine Units.
- Remote Terminal Connectivity on IEC-60870-5-101
- PLC Panel Connected with Switch Yard, LT Panels And all Field Instruments.
Control Features on SCADA:
- Hydro Turbine Governing
- Hydro Turbine Synchronising
- Hydro Turbine Control and Safeties
- HT Feeders on on/of Control.
- Generator Breakers on/off Control.
- Isolator on/off Control
- Turbine Auto Start/Stop Control
- Load Raise/ Load Lower Control
- Remote Terminal Control On Units.
Display Features:
- On/off Status For All Incomers And Outgoing Feeders.
- Tripping Status For All Incomers And Outgoing Feeders.
- Tripping Status For All Protection Relays.
- Charged Bus Bar Status.
- Voltage, Current, KWH, HZ, KW, Kvar Display For All Feeders
- Units Tripping Status
- Generator Parameters Display
- Turbine Parameters Display
- OPU Parameters Display
- GLOP Parameters Display
- Switch Yard Parameters Display.
Data Logging Features:
- Time Base Data Logging Facility
- Shift Wise Data Logging.
- Event Data Logging.
- Alarm Data Logging.
- Turbine Running Hour Data Logging
- Turbine, Generator, Transformer And Bus Bar Temperature Data Logging.
Trending:
- Current Trending For Power Parameters(Voltage, Current, KW)
- Historical Trending For Power Parameters.
Report Printing:
- Trend Screen Printing
- Shift Report Printing
- Historical Data Printing For Logged Power Parameters, Alarm And Events